Bergek CNC | Customized cnc turned components manufacturer

Bergek CNC | Customized cnc turned components manufacturer

Our team strictly tests the its quality based on the industry standard before package.

Different kinds of stainless steel due to different mechanical properties and chemical composition of its CNC cutting difficulty is not the same. In some stainless steel in the cutting process, it is difficult to achieve satisfactory processing surface roughness; And some stainless steel, although easy to meet the requirements of the processing surface roughness, but in the process of the cutting tool is particularly easy to wear.

Products Details

At Bergek CNC, technology improvement and innovation are our core advantages. Since established, we have been focusing on developing new products, improving product quality, and serving customers. cnc turned components We will do our best to serve customers throughout the whole process from product design, R&D, to delivery. Welcome to contact us for further information about our new product cnc turned components or our company.cnc turned components is an arising developed on the basis of .


Product Details:


Type:


1. Heat pipe with straight thread


2. Step threaded hot casing


3. Heat tube with tapered thread


4. Socket hot tubing


5. Pipe thermal sleeve


6. Labeled hot casing


7. Customized Thermowells


Line: custom


Material: carbon steel, stainless steel, brass, aluminum


How to choose hot casing:


1. Choose an aperture for maximum flexibility


2.For higher fluid velocities, Chose tapered; For lower fluid velocities,Chose straight


3. Choose materials


4. Select the correct connection


Often ask questions


Q: Are you a trading company or a manufacturer?


A: We are manufacturers.


Stainless steel hot tube for a temperature sensor with top CNC threaded probe


Q: Can you provide samples?


A: Samples are in stock. We can supply them.


Q: How do you guarantee the quality?


A: We have A QC department to control the quality of products from the start of production to completion.


Q: Is my drawing safe after it is sent to you?


A: Yes, we will keep them safe and will not disclose them to third parties without your permission.


Q: How long will the lead time be?


A: Mass production: about 20~25 days after receiving the deposit (may vary with specific items and quantity of items)


Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --
Send your inquiry
Chat
Now

Send your inquiry

Attachment:
    Choose a different language
    English
    Tiếng Việt
    Bahasa Melayu
    हिन्दी
    русский
    Português
    한국어
    日本語
    italiano
    français
    Español
    Deutsch
    العربية
    Current language:English